THE LOBO ADVANTAGE: PRB Client Case Study

Greater Load Volume + Improved Logistics & Equipment Management = Increased ROI



Background

  • Frac company engaged Lobo Logistics to provide turn-key mine to wellsite logistics solution for PRB E&P.

Challenge

  • E&P client sought to improve wellsite operations, efficiency and safety while reducing the AFE.

  • Lobo Logistics worked with the frac company to deploy the first FB Atlas Conveyor into the PRB.

  • Lobo Logistics deployed its HAUL-MAX solution to meet client objectives.

Results

  • Loads per well decreased by ~40%

  • 15% reduction in logistics costs vs status quo.

  • Annual cost savings per fleet of ~$1.2M.

  • Zero NPT.

  • All loads completed under single trucking company à improved risk management.